
Education Tablet Battery Program Across 200K Units
A tablet OEM needed consistent runtime across a multi-country education rollout under tight BOM cost pressure.
Case Overview
Project Snapshot
- Category: Digital Electronics
- Challenge: A tablet OEM needed consistent runtime across a multi-country education rollout under tight BOM cost pressure.
- Solution: EPT custom cell and Battery Pack design with full-process validation
- Results: Validated in field trials and approved for mass production
Key Outcomes
- Status
- In Mass Production
- Lead Time
- 12 weeks
Industry Challenge
A tablet OEM needed consistent runtime across a multi-country education rollout under tight BOM cost pressure.
The EPT Solution
EPT Battery matched the optimal chemistry, PCM and mechanical design to the device's duty cycle, then completed safety and lifespan testing in a CNAS-accredited laboratory.
Results
The client signed off after DVT and transferred mass production to EPT Battery production lines.
Planning a similar project?
Share your constraints and target specifications — our engineers will reply within one business day.



